Electrical Plan Check Requirements for Commercial Structures:
In addition to the GENERAL PLAN CHECK REQUIREMENTS, when
application is made to construct a commercial building, a complete electrical
plan must be submitted before permits for such work are issued.
General Requirements
Seven copies of plans, specifications, calculations and
equipment brochures.
-
Good grade reprocopy (Xerox) or standard blue/black line
paper
-
No red ink or pencil
-
Signature of designer with license number or seal on first
sheet of both sets in ink ONLY. Unlicensed designers will not be accepted.
-
Minimum sheet size 18" x 24"
For Additions and Remodels:
Specific Requirements:
Schematic diagram of all wire runs including main, sub feed,
branch circuits
-
Indicate with standard symbols all fixtures, junction boxes,
load centers, main panels.
-
Scale 1/4" - 1'-0" standard for overall plan. Use
appropriate scale for details and sections.
-
Indicate all materials used for wiring runs including
raceways, supports, panels, service entrance, etc.
-
Indicate bonding/grounding system.
-
Provide load schedule; should include; disconnect/over current
protection means, working voltages/amperages/wattage/horsepower/etc.
-
Show compliance with current Title 24 non-residential energy
standards as adopted by the California Energy Commission
Electric Requirements
- Indicate compliance with Title 24 California Electrical Code regarding
accessible electrical elements.

Mechanical Plan Check Requirements for Commercial Structures
In addition to the GENERAL PLAN CHECK REQUIREMENTS, when application is made
to construct a commercial building, a complete mechanical plan must be submitted
before permits for such work are issued...
General Requirements
Seven copies of plans, specifications, calculations and equipment
brochures.
-
Good grade reprocopy (Xerox) or standard blue/black line
paper
-
No red ink or pencil
-
Signature of designer with license number or seal on first
sheet of both sets in ink ONLY. Unlicensed designers will not be accepted.
-
Minimum sheet size 18" x 24"
For Additions and Remodels:
Specific Requirements:
Show compliance with current Title 24 non-residential energy
standards as adopted by the California Energy Commission.
-
Schematic floor plan indicating duct runs, branches,
supports, and related fittings. Use standard symbols. (An isometric plan may
be required on complicated systems.)
-
Identify all equipment in system including air handler(s),
HVAC equipment, etc. Include all make, model, size, installation details,
etc. HVAC equipment must be CEC approved.
-
Identify combustion air sources for fuel burning equipment.
-
Dimension all runs.
-
Call out materials, sizes and types.
-
Demonstrate flue (venting) design details for fuel burning
equipment.
-
Indicate how penetrations in rated construction are
protected.
-
Differentiate between supply air and return air ducts.
-
Provide information to local fire district on all flammable
gasses and liquids handled by system.
Kitchen Hoods:
Indicate all fuel burning equipment to be protected (include
size).
-
Provide plan view and elevation views for two sides not more
than 90 degrees apart. (Indicate relationship to kitchen floor area).
-
Indicate vertical distance between top of equipment &
lip of hood.
-
Indicate shaft construction, cleanout(s), blower detail and
make-up air blower. (Must be tempered make-up if over 2500 cfm.).
-
Call out all materials, sizes, fasteners, controls, etc.
-
Provide fire suppression system details to local fire
district.
-
For Type I hoods provide duct sizing calculations.

Plumbing Plan Check Requirements for Commercial Structures
In addition to the GENERAL PLAN CHECK REQUIREMENTS, when
application is made to construct a commercial building, a complete electrical
plan must be submitted before permits for such work are issued.
General Requirements
Seven copies of plans, specifications, calculations and
equipment brochures.
-
Good grade reprocopy (Xerox) or standard blue/black line
paper
-
No red ink or pencil
-
Signature of designer with license number or seal on first
sheet of both sets in ink ONLY. Unlicensed designers will not be accepted.
-
Minimum sheet size 18" x 24"
For Additions and Remodels:
Specific Requirements:
DWV Systems:
Show compliance with current Title 24 non-residential energy
standards adopted by the California Energy Commission.
-
Isometric diagram of main run, branches, vents, fittings,
and fixture location.
-
Schematic floor plan indicating relationships of fixtures
and locations. Use standard symbols.
-
Indicate all materials used in DWV systems if less than
1/4" per foot. (Pre-approval required for slopes less than 1/4"
per foot).
-
Indicate fixture make, type, etc. Fixtures must be listed
types approved by CEC.
-
Dimension run lengths.
-
Provide cleanouts per UPC
Water/Gas Systems (Piping system only):
Schematic diagram of piping layout, isometric diagrams may
be required on more complicated systems.
-
Indicate demand load per fixture/appliance served.
-
List fixture/appliances by make, model, etc. Provide
manufacturer's data as applicable.
-
Dimension run lengths.
-
Indicate working pressures.
-
Indicate working pressures.
-
Indicate bonding system(s) used.
Plumbing Requirements
|