Bookmark and Share
Planning Department Banner, This link takes you back to home page
Environmental Documents Open for Public Review

Initial Studies

Project Name Application # APN Address / Location Owner Name Project Description Public Comment Period Ends

Seacliff Village Hotel APPL. # 201003
Initial Study

201003 042-022-12 PRAKASH PATEL Property located at the northeast corner of North Ave. and Broadway in Seacliff (at 270 North Ave.) within the community of Seacliff Village in unincorporated Santa Cruz County (Figure 1). Santa Cruz County is bounded on the north by San Mateo County, on the south by Monterey and San Benito counties, on the east by Santa Clara County, and on the south and west by the Monterey Bay and the Pacific Ocean. November 22, 2021

 

County EIRs

 

Project Name Description Public Comment Period

Rail Trail Segments 10 and 11

Visit https://www.dpw.santacruzcounty.us/RailTrail for project description, Notice of Preparation, and Scoping Meeting information

Tuesday, December 7, 2021, 5:00 PM

Medical Office Building Project

Notice of Availability

Aviso de Disponibilidad

Medical Office Building Project Draft EIR

Draft EIR Appendices

Application

Notice of Preparation of a Draft EIR and Scoping Meeting

Plans

EIR Scoping Meeting Presentation (4-2-20)

Scoping Meeting Summary

Aviso en Espanol

The proposed project would be comprised of a new four-story medical office building measuring approximately 60 feet in height to finished roof and approximately 74 feet to top of mechanical screens on the rooftop. The proposed building would provide approximately 160,000 gross square feet of medical office use for specialty outpatient services. Services may include advanced medical and urgent care clinics, and outpatient surgery facilities, support services for urgent care and outpatient surgery including pharmacy, laboratory, imaging facilities, primary care, women's health, pediatric health, optometry, hearing, vision essentials, neurology, endocrinology, gastroenterology, hematology/oncology, infectious diseases, rheumatology, nephrology, pulmonology, sleep lab, orthopedics, podiatry, pain medicine, physical medicine and rehabilitation dermatology, health education, telehealth, cafe, and administrative office spaces. The facility would be open to the public from 8:00 a.m. to 8:00 p.m., but urgent care and ancillary functions would operate continuously, without closing. The expected number of on-site staff, at peak, would be approximately 300 persons.

The proposed project would also include the construction of a four-story parking garage across an internal roadway west of the proposed medical office building. It would accommodate five levels of parking, with 730 new vehicle parking spaces to serve the on-site medical uses, including approximately 47 charging stations for electric vehicles and bike lockers. A new driveway would be constructed from Soquel Avenue that facilitates circulation between the medical office building and parking garage. A separate driveway for service vehicles would be constructed. The proposed project would include street frontage improvements along Soquel Avenue, including new pedestrian sidewalks and bicycle facilities, as well as potential off-site intersection improvements. The proposed project would also require on-site and off-site utility and drainage improvements, including new 8-inch sanitary sewer, 8-inch fire, and 4-inch domestic water lines, as well as a new stormwater outfall that would be constructed along Rodeo Creek Gulch, approximately 1,200 feet east of the site.

Located on APN 029-021-47 (5940 Soquel Avenue, Santa Cruz)

8/9/2021

Please click here to provide comments on this project

 

Sustainability Policy and Regulatory Update Environmental Impact Report (EIR)

Notice of Preparation

Notice of Extended NOP Comment Period

The proposed project is the Santa Cruz County’s Sustainability Policy and Regulatory Update of the County’s General Plan/Local Coastal Program (LCP) and County Code (Sustainability Update). The County’s existing General Plan/LCP was adopted in 1994 with a focus on preserving natural and agricultural resources and limiting urban expansion. After more than 25 years, the General Plan/LCP requires updating to define a more sustainable growth pattern for the future. The broad sustainability goals of the proposed project include updating the goals, objectives, policies, and implementation strategies of the General Plan/LCP and implementing regulations in the County Code to:

  • Incorporate a new planning horizon for population, housing, and employment growth, consistent with Measure J growth management principles and with the Sustainable Community Strategy for the region;
  • Reflect the sustainability vision and guiding principles of the Sustainable Santa Cruz County Plan, as well as the County Strategic Plan goals of Attainable Housing, Reliable Transportation, Dynamic Economy, Sustainable Environment, Comprehensive Health & Safety, and Organizational Excellence;
  • Ensure compatibility with land use and transportation planning principles that support reduction of greenhouse gas emissions;
  • Define new land use designations to increase housing choices and workplace flexibility;
  • Update and modernize the County Code permit procedures and development standards;
  • Adopt Countywide Design Guidelines and special guidelines for the Pleasure Point and Portola Drive Commercial Corridor; and
  • Meet recent state requirements and regulations.

See the Notice of Preparation for additional project information. Visit https://www.sccoplanning.com/sustainabilityupdate to learn more about the proposed General Plan/LCP and County Code amendments and timeline for the project.

Public comment on the scope of the EIR will be accepted through September 4, 2020 at 5 p.m.

A scoping meeting on the project was held on July 21, 2020.

Comments on the scope of the EIR will be accepted in writing (see the Notice of Preparation for mailing address), or via email. Click here to email comments on the scope of the EIR for this project: CEQA-NEPA@santacruzcounty.us. Please reference the project name in the email title.

Additional opportunities for public review of and comment on the amendment documents and the Draft EIR will occur prior to adoption. Visit https://www.sccoplanning.com/sustainabilityupdate to learn more about the timeline for upcoming community meetings and public hearings for the project.