Bookmark and Share
Planning Department Banner, This link takes you back to home page
Environmental & Resource Protection
CEQA Documents Open for Public Review

Initial Studies

Project Name Application # APN Address / Location Owner Name Project Description Public Comment Period Ends

CVS

Notice of Intent, Mitigated Negative Declaration, Initial Study and Attachment 1-4

Attachments 5-7

181576 025-071-05 & -20 Plymouth-Grant LLC The proposed project is to combine two parcels, demolish the existing improvements, and construct a new 13,111 square foot retail pharmacy - including a mezzanine for storage - with a drive-through pharmacy window, and related improvements, including frontage improvements and business signs. The project requires a Commercial Development Permit, an Exception to reduce the required landscape strip from five to two feet, and an Exception to allow four signs totaling 92 square feet where one sign and 50 square feet is allowed. 04/27/2020
           

 

County EIR's

Project Name Description Public Comment Period Ends

Medical Office Building Project

Application

Notice of Preparation of a Draft EIR and Scoping Meeting

Plans

EIR Scoping Meeting Presentation (4-2-20)

 

Aviso en Espanol

The proposed project would be comprised of a new four-story medical office building measuring approximately 60 feet in height to finished roof and approximately 74 feet to top of mechanical screens on the rooftop. The proposed building would provide approximately 160,000 gross square feet of medical office use for specialty outpatient services. Services may include advanced medical and urgent care clinics, and outpatient surgery facilities, support services for urgent care and outpatient surgery including pharmacy, laboratory, imaging facilities, primary care, women's health, pediatric health, optometry, hearing, vision essentials, neurology, endocrinology, gastroenterology, hematology/oncology, infectious diseases, rheumatology, nephrology, pulmonology, sleep lab, orthopedics, podiatry, pain medicine, physical medicine and rehabilitation dermatology, health education, telehealth, cafe, and administrative office spaces. The facility would be open to the public from 8:00 a.m. to 8:00 p.m., but urgent care and ancillary functions would operate continuously, without closing. The expected number of on-site staff, at peak, would be approximately 300 to 350 persons.

The proposed project would also include the construction of a four-story parking garage across an internal roadway west of the proposed medical office building. It would accommodate five levels of parking, with 730 new vehicle parking spaces to serve the on-site medical uses, including approximately 47 charging stations for electric vehicles and bike lockers. A new driveway would be constructed from Soquel Avenue that facilitates circulation between the medical office building and parking garage. A separate driveway for service vehicles would be constructed. The proposed project would include street frontage improvements along Soquel Avenue, including new pedestrian sidewalks and bicycle facilities, as well as potential off-site intersection improvements. The proposed project would also require on-site and off-site util.ity and drainage improvements, including new 8-inch sanitary sewer, 8-inch fire, and 4-inch domestic water lines, as well as a new stormwater outfall that would be constructed along Rodeo Gulch, approximately 1,200 feet east of the site on APNs 029-031-11 and 029-031-14.

Located on APN 029-021-47 (5940 Soquel Avenue, Santa Cruz)

04/22/2020

Please click here to provide comments on this project

 

DUE TO COVID-19 HEALTH CONCERNS, THE COMMENT PERIOD FOR THIS PROJECT HAS BEEN EXTENDED TO MAY 1 AT 5:00 P.M.

 

DEBIDO A LAS PREOCUPACIONES DE SALUD DE COVID-19, EL PERÍODO DE COMENTARIOS PARA ESTE PROYECTO SE HA EXTENDIDO AL 1 DE MAYO A LAS 5:00 P.M.

Nissan of Santa Cruz Project

Notice of Availability
Notice of Availability(archive)
Notice of Availability (archive)

Draft EIR
Final EIR
Recirculated Partial Draft EIR

Final EIR Volume 2

Figure 2-3 - Conceptual Site Plan

Technical Appendices:  A   B   C   D   E   F   G   H   I   J   K   R

FEIR, Vol 2

 

 

EIR's

Project Name Application # APN Address / Location Owner Name Project Description Public Comment Period Ends